|
|
|
|
| Worksheet b: INVENTORY OF RAW MATERIALS | |||
|
Company: Armond Engineering Ltd Completed by: J Prices Date: 20/7/99 List all major raw materials used and stored on site (including chemicals, oils, packaging materials and work from your customers).
|
|||
| Raw Material | Annual Consumption | Storage Method | Storage Location |
| Paint thinners | 1 600 litres | Drums | Materials store in rear yard |
| Paints | 104 000 litres | Drums | Materials store in rear yard |
| Oil | 1 000 litres | Barrels | Materials store in rear yard |
| Cutting fluid | 2 000 litres | Drums | Pallets in main workshop |
| Components | 60 tonnes | Racks and bins | Main workshop |
| Adhesives | 500 litres | Small pots | Racks in main workshop |
| Plastic wrap | 150 rolls | Rack | Despatch |