Glynwed Brickhouse FoundryBriefly the Energy Improvement Strategy for the foundry encompassed:
|
Energy Issue | Measure | Cost | Saving |
Compressed air blows to open ends and leaks. | Total cost of compressed air: £55k/an- reduction of leaks and control. | £30k. | £29k/an. |
Variable speed drives. | Cost of implementation high. | High. | £50k (estimated). |
Disposal of slag. | Spin slag into fibre for use as a high temperature insulator. | THERMIE application recommended. | £200k (estimated). |
Electricity consumption at night and weekend remains higher than expected. |
New core-belter required and/or changes to compressed air system. A new core-belter can be operated on a JIT basis, grant monies are availlable. |
Unknown. | £10k. |
Implementation of a programme of monitoring and targeting. | Constant monitoring of utilities costs against target. | £18k. | £55k. |
Purchasing contract changes. | Sensitive due to group involvement: The pool trading arrangements are showing instability at the moment and a fixed rate contract is advised for risk management (hedging). | £5k | £10k. |
![]() |