Radiated Immunity - Measurement Standards



Example of Test Set-Up

Example of test set-up with a single-unit system for class II safety equipment

Displayed here is an overview of a test set up including the Device under Test (DUT), a CDn for Main and the test generator, providing the disturbances.

All non-excited input ports of the CDn's shall be terminated by 50 Ohm loads. A 6dB attenuator must be connected between the CDN and the disturbance generator.